| | |

From Water to Wire. One Partner.

Four end-to-end solution packages covering the full lifecycle of a hydropower plant — greenfield EPC, off-grid microgrids, plant retrofit, and long-term O&M. Designed for African conditions, delivered by a China-Madagascar joint venture.

01 EPC Turnkey
Francis turbine assembly on factory floor
100 kW – 100 MW
01 EPC Turnkey Hydropower

Greenfield Hydropower — From Feasibility to Commissioning

A single-contract solution for new hydropower plants. We handle everything from site survey and hydrological analysis to turbine manufacturing, civil construction, electrical system integration, grid connection, and performance testing. One contract, one accountable party, zero finger-pointing.

  • Feasibility & Design — Hydrological survey, geological assessment, plant sizing, tender drawings
  • Equipment Manufacturing — Turbine, generator, governor, excitation, valves — all in-house
  • Civil Works — Intake, penstock, powerhouse, tailrace — supervised by HIER site engineers
  • Electrical Integration — Switchgear, transformer, SCADA, protection, grid synchronization
  • Commissioning & Handover — Load testing, 72-hour trial run, as-built documentation, operator training
Capacity Range 100 kW – 100 MW
Typical Duration 14 – 36 months
Warranty 24 months
02 Microgrid
TC HYDRO factory — in-house assembly and quality control for control systems
Off-Grid / Hybrid
02 Microgrid & Hybrid Energy

Solar-Hydro-Diesel Hybrid for Rural Electrification

For remote communities and industrial sites beyond the grid, we design and build hybrid microgrids that combine hydropower with solar PV and diesel backup. Our SCADA platform orchestrates multiple sources in real time, optimizing for cost, reliability, and minimal environmental impact.

  • Hybrid System Design — Load profiling, source mix optimization, battery sizing, simulation modeling
  • Smart SCADA Platform — TCH-SCADA 3000 with real-time dispatch, remote monitoring, automated failover
  • Solar PV Integration — Panel procurement, inverter selection, mounting structures, grid-tie or off-grid
  • Diesel Backup — Standby gensets, automatic transfer switches, fuel optimization algorithms
  • Distribution Network — Mini-grid lines, transformers, smart meters, customer billing system
System Size 50 kW – 10 MW
Typical Duration 6 – 18 months
Households Served 100 – 10,000+
03 Retrofit
Turbine runner replacement during plant retrofit
Upgrade & Modernize
03 Plant Retrofit & Modernization

Breathe New Life into Aging Hydropower Assets

Many African hydropower plants built in the 1970s–1990s still have sound civil structures but suffer from worn turbines, obsolete controls, and unreliable switchgear. We assess, upgrade, and modernize — extending plant life by 30+ years and boosting efficiency by 5–15%.

  • Condition Assessment — On-site inspection, runner wear analysis, efficiency audit, remaining-life study
  • Turbine Replacement — New runner design (Pelton, Francis, Kaplan), reverse-engineered to match existing civil works
  • Generator & Excitation Upgrade — Rewinding, new AVR, brushless excitation conversion
  • Control & Protection Modernization — SCADA retrofit, digital protection relays, new switchgear panels
  • Performance Optimization — CFD runner redesign, efficiency improvement, capacity uprating where feasible
Efficiency Gain +5% to +15%
Typical Duration 4 – 12 months
Life Extension 30+ years
04 O&M
Operator training session at TC factory
Long-Term Partnership
04 O&M Services

Keep Your Plant Running at Peak Performance

A hydropower plant is a 50-year asset. Our O&M packages ensure it performs at design efficiency throughout its life. From routine inspections to emergency response, spare parts management to capacity building — we stay with you long after commissioning.

  • Preventive Maintenance — Scheduled inspections, vibration analysis, oil testing, runner condition monitoring
  • Spare Parts Supply — OEM- guaranteed inventory of wear parts, runners, bearings, seals — shipped from China
  • Emergency Response — 24/7 remote diagnostics via SCADA, on-site dispatch within 48 hours (Madagascar)
  • Operator Training — Factory-acceptance training in China, on-site commissioning training, refresher courses
  • Performance Reporting — Monthly generation reports, efficiency trending, predictive maintenance alerts
Contract Types 1 / 3 / 5 years
Response Time < 48 hours
Uptime Guarantee 98%+
How We Deliver

Six-Stage Delivery Process

From the first site visit to year-30 maintenance — one continuous chain of accountability.

Feasibility

Site survey, hydrology, grid study, cost estimate

Design

Turbine selection, civil drawings, electrical layout, BOQ

Manufacturing

Turbine, generator, switchgear — in-house production

Logistics & Civil

Shipping, customs, site preparation, civil construction

Install & Commission

Erection, testing, 72-hour trial, grid connection

O&M

Training, spares, monitoring, lifetime support

What's Included

Solution Capability Matrix

Compare what each solution package delivers. All packages include HIER local engineering support and TC factory warranty.

Service Component EPC Turnkey Microgrid Retrofit O&M
Feasibility Study
Turbine Manufacturing
Civil Construction
Electrical System
SCADA System
Solar PV Integration
Commissioning
Operator Training
Spare Parts Supply
Remote Monitoring
Emergency Response
EPC Project Timeline

Typical 20 MW Project — 24 Months

Indicative timeline for a medium-sized EPC project. Actual duration depends on site conditions, permitting, and financing.

Phase 1 Months 1–3

Feasibility Study & Site Assessment

Hydrological data collection, geological survey, environmental impact assessment, grid connection study, preliminary cost estimate.

Feasibility Report Cost Estimate Site Layout
Phase 2 Months 3–6

Detailed Engineering & Design

Turbine type selection and sizing, civil structure design, electrical single-line diagrams, control system architecture, BOQ preparation.

Design Drawings Technical Spec BOQ
Phase 3 Months 6–14

Equipment Manufacturing

Turbine runner casting and machining, generator winding, switchgear assembly, control panel fabrication. Factory acceptance test (FAT) with client witness.

Turbine Set Generator Switchgear FAT Certificate
Phase 4 Months 8–16

Civil Works & Site Preparation

Access road construction, river diversion, intake excavation, penstock installation, powerhouse construction, tailrace works. Overlaps with manufacturing.

Civil Structure Penstock Powerhouse
Phase 5 Months 14–20

Equipment Installation

Turbine and generator erection, piping and valve installation, switchgear placement, cabling, SCADA commissioning. HIER engineers on-site throughout.

Mechanical Install Electrical Install SCADA Setup
Phase 6 Months 20–24

Testing, Commissioning & Handover

Dry test, wet test, load test, 72-hour continuous trial run, grid synchronization, performance verification, operator training, as-built documentation handover.

Commissioning Report Performance Cert Training Completion As-Built Docs
Why TC × HIER

Three Advantages No Single-Geography Supplier Can Match

Factory-Direct Pricing

No middlemen. Turbines, generators, and switchgear ship directly from our Changsha factory to your site. You pay for equipment, not for layers of trading companies.

Local Execution, Local Knowledge

HIER's team in Antananarivo handles permits, site supervision, customs, and community relations. We speak the language, know the regulations, and have been operating in Madagascar since 2008.

Single-Source Accountability

One contract covers turbine, generator, electrical, civil, and commissioning. If something goes wrong, there is no finger-pointing between suppliers. We own the outcome — start to finish.

Tell Us About Your Site

Share your river data, power requirement, or project concept. Our engineers will respond within 48 hours with a preliminary assessment.